Global References

Delivering excellence through innovation, quality, and commitment to our customers worldwide.

Providing efficient ventilation and exhaust systems for a comfortable environment.

Providing efficient ventilation and exhaust systems for a comfortable environment.

Client: client 1

Building Type: 123

Area: 123

Hot air accumulates at the top of the energy plant, causing high temperatures and making it impossible to work for long periods of time. High temperatures shorten the lifespan of…
We replaced the pressure pumps in three large apartment buildings.

We replaced the pressure pumps in three large apartment buildings.

Client: .

Building Type: Apartment

Area: Urayasu City, Chiba Prefecture

We carried out plumbing work for three large apartment complexes and replaced the pressure pumps. The piping and pump installation was carried out with the next pump replacement in mind ,…
I replaced the bathtub filter.

I replaced the bathtub filter.

Client: .

Building Type: .

Area: Koto Ward, Tokyo

The heater function of the existing filtration system had stopped due to age-related deterioration, so we replaced the filtration system and chemical injection pump during this construction project .
The water tank in the restaurant building has been updated.

The water tank in the restaurant building has been updated.

Client: :

Building Type: Restaurant building

Area: Funabashi City, Chiba Prefecture

We carried out plumbing work to replace a rooftop water tank (elevated tank) that had been leaking due to aging. The work was carried out while the water pump was…

The water tank in the restaurant building has been updated.

We carried out plumbing work to replace a rooftop water tank (elevated tank) that had been leaking due to aging. The work was carried out while the water pump was running, and we planned to ask businesses to refrain from using water for a total of two days (the work was carried out during closing time at night).

Client Name

Building Overview

Area

Building Type:Restaurant building
Floor height:6-story building
Number of units:

Funabashi City, Chiba Prefecture

Benefits of this project

By updating the elevated water tank, the risk of water outage due to breakdowns or other problems will be reduced.

Before Construction :

After Construction :

Not Admin - Template: header-footer.php